04/30 Niles Canyon Railway Track Crew

Go [ back in time. | up the tree. | into the future! ]

IMG_3435

The tamper leaving the yard. The tamper forces ballast under the newly placed tie.

IMG_3437

The Burro.

IMG_3438

Gerald Dewitt and compatriots helping with a boiler retube on #3. I think Gerald is hand-fitting a newly-machined part.

IMG_3439

A close up of SP 5623. I've always liked the "Radio Equipped" bit.

IMG_3441

Two beautiful SP diesel-electric locomotives painted in the Black Widow scheme.

IMG_3443

A view from the front of the work train. The deck is part of the bridge over the roadway, Highway 84, below.

IMG_3444

We spent most of the time at this site, where we replaced a majority of the thirty ties replaced that day. A retaining wall about 25 feet high keeps the track bed above the roadway below--a nice distance to fall!

IMG_3445

Here we are at mile post 32, loading away the tools after replacing ten ties at the site.